Design and construction of Aravete 0.85 MW boiler plant

Completed district heating boiler plant with chimney and auxiliary buildings
Boiler house foundation and construction works at Aravete district heating project
Steel frame installation
Transport and delivery of biomass boiler plant equipment from Tamult production facility
Transport and delivery of biomass boiler plant equipment from Tamult production facility
Industrial boiler house building under construction with steel cladding and concrete foundation
Internal piping and equipment installation inside district heating boiler plant
Mechanical piping skid with pumps and heat exchanger installed inside an biomass boiler plant
Biomass fuel storage with moving floor system for district heating boiler house
Biomass boiler house control panel and auxiliary generator installation at Aravete district heating plant
Biomass boiler unit with flue gas ducting
Biomass boiler
Ash container with screw conveyor and level sensor installed at Aravete biomass boiler house
Exterior view of Aravete biomass heating plant completed by Tamult

Description

Tamult designed and delivered a fully operational boiler plant in Aravete as a turnkey solution, in accordance with the technical specifications of the public procurement. The aim of the project was to ensure a reliable, flexible and fully automated heat generation system that can adapt to changes in fuel quality and load and meet the needs of the local district heating network.

The main load of the boiler plant will be covered by a biofuel boiler with a nominal capacity of 0.85 MW, designed to operate with wood chips, bark and sawdust in the moisture range 30-55%. The boiler operates automatically in the load range 30-100%, allowing on/off mode at low loads. The system operates at 105/90 °C, with a maximum temperature and pressure of 110 °C/6 bar, achieving an efficiency of at least 85% according to EVS EN 12953. The boiler is equipped with an internal circulating pump with frequency converter to prevent low temperature corrosion.

To cover peak and reserve loads, Tamult installed a liquid-fired boiler with a nominal capacity of 0.8 MW and an efficiency of at least 91%. The boiler is equipped with a heavy oil burner, multi-stage control and fully complies with CE marking requirements.

A 200 m³ biofuel storage facility was built as a separate fire compartment for fuel handling, allowing the boiler to operate at full load for about one week and at average load for up to two weeks. Fuel is received directly from the truck without the need for an additional loader. The warehouse scraper floor is equipped with a water-fired underfloor heating system, controlled by a floor temperature sensor, with a minimum power of 250 W/m², ensuring reliability even in difficult winter conditions.

The waste management solution is designed to be fully automatic. The boiler house is equipped with a 10 m³ hermetic ash container with a levelling plug and a fill level sensor. All connections are dust- and leak-proof and the container is serviceable from the ground and lockable, facilitating safe and efficient handling.

The success of the project is also confirmed by the contracting authority’s assessment of the cooperation and the result:

“We are very grateful to Tamult AS. The construction of the Aravete boiler house has been one of the most worry-free constructions for the contractor. We have received a boiler house that meets our needs on the agreed terms and at a reasonable price.”

Andres Sapas, AS Järva Haldus, Member of the Management Board

The result is a state-of-the-art biomass-based district heating solution that meets stringent technical requirements, ensures high efficiency and reduces long-term operation and maintenance costs. The project confirms Tamulti’s ability to carry out complex boiler solutions from design to delivery of a complete and reliable system.

Customer

Järva Haldus AS

Fuel

Woodchips

Power

0.85 MW

Project

Design and construction of Aravete 0.85 MW boiler plant

Installed

2025

Country

Eesti

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team