Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Edsbyn (Sweden) 6 MW Superheated Water Boiler Plant

Description

Installation of superheated water boiler plant technology in Edsbyn with a capacity of 6 MW.

Within the scope of the project, we installed the entire technological equipment of the boiler plant, from fuel reception to ash removal. The equipment also includes an electrostatic precipitator and a flue gas condenser with process piping and condensate treatment (Scheuch).

We designed, manufactured, and installed the superheated water piping and the associated equipment together with the heat exchanger from the boiler to the district heating pipeline outlet point in the boiler room. The pump and heat exchanger units were assembled on three transport frames in our production facility in Estonia.

For the project, we manufactured a furnace for the combustion of wet biofuels, air and flue gas ducts, a fuel conveyor, a wet ash conveyor, a dry ash screw conveyor, a hydraulic fuel feeder, a moving-floor fuel storage, and various steel structures.

Customer

Saxwerk AB, Scheuch GmbH

Fuel

Woodchips

Power

6 MW

Project

Edsbyn (Sweden) 6 MW Superheated Water Boiler Plant

Installed

2023

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team