Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Manufacturing and installation of a 20 MW electrostatic precipitator at Fiskarheden

Electrostatic precipitator emissions control system for biomass boiler plant
Electrostatic precipitator manufacturing
Electrostatic precipitator manufacturing in Tamult workshop
Manufacturing of steel structures for electrostatic precipitator
Electrostatic precipitator installation at Fiskarheden biomass boiler plant
Outdoor installation of electrostatic precipitator for biomass boiler plant
Thermal insulation installation on electrostatic precipitator system
Electrostatic precipitator system for flue gas cleaning in biomass energy plant
Assembly works of electrostatic precipitator
Electrostatic precipitator installation at Fiskarheden 20 MW biomass boiler house

Description

As part of the Fiskarheden 20 MW biomass-fired boiler house project, we manufactured and installed an electrostatic precipitator (ESP) for flue gas cleaning. The solution is designed to ensure efficient removal of particulate matter from the flue gases while also enabling more effective use of residual heat, improving the overall environmental performance and operational reliability of the boiler plant.

For the project, the electrostatic precipitator was manufactured at the factory as a modular solution and finally assembled and installed on site. The ESP was installed outside the boiler house and integrated into the existing flue gas system, including the required flue gas ducts and connections.

The installed solution complies with the requirements arising from European Union climate directives and meets the emission limit values set by the Medium Combustion Plant Directive (MCPD 2015/2193). These requirements aim to reduce emissions of particulate matter and other pollutants across EU member states. The project supports the boiler house’s long-term, environmentally compliant, and efficient operation.

Customer

ECP Airtech AB

Fuel

Woodchips

Power

20 MW

Project

Electrostatic precipitator for the Fiskarheden 20 MW wood chip boiler

Installed

2025

Country

Sweden

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners