Installation of the Second Stage Flue Gas Condenser at Utilitas Mustamäe CHP Plant
Description
As part of this project, we installed the second-stage flue gas condenser at Utilitas’ combined heat and power plant located in Mustamäe, Tallinn.
To carry out the installation, a minimal section of the boiler house wall and the existing flue gas duct together with the fan were dismantled. The 26-ton condenser was then lifted into place using two cranes, utilising an opening in the building’s wall and two small smoke extraction hatches in the roof.
After the condenser was installed, the flue gas fan was reinstalled and the flue gas ducts were reconnected.
Customer | AS Utilitas Tallinna Soojus |
Fuel | Woodchips |
Power | - |
Project | Installation of the Second Stage Flue Gas Condenser at Utilitas Mustamäe CHP Plant |
Installed | 2022 |
Why are we a good partner?
We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.
The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.
Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.