Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Kalix (Sweden) 6 MW Hot Water Boiler Plant, Electrostatic Precipitators and Condenser

Description

Within the scope of the project, we replaced the old 6 MW boiler system at the Solör Bioenergi Kalix boiler plant with a new one, also adding an electrostatic precipitator and a flue gas condenser (Scheuch) together with process piping and condensate treatment equipment. In addition, we replaced the old electrostatic precipitator (Scheuch) of the second boiler in the plant with a new one.

For the project, we manufactured a furnace for biofuel combustion, a fuel scraper conveyor and hydraulic feeder, a wet ash conveyor, and various screw conveyors.

Customer

Saxwerk AB, Scheuch GmbH

Fuel

Woodchips

Power

6 MW

Project

Kalix (Sweden) 6 MW Hot Water Boiler Plant, Electrostatic Precipitators and Condenser

Installed

2024


Warning: Undefined array key -1 in /data03/virt56867/domeenid/www.tamult.ee/htdocs/wp-content/themes/tamult/functions/hooks.php on line 246

Warning: Attempt to read property "ID" on null in /data03/virt56867/domeenid/www.tamult.ee/htdocs/wp-content/themes/tamult/functions/hooks.php on line 246

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team