Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Reconstruction of the push floor system

Completed industrial warehouse floor and scraper system installed by Tamult in Austria
Manufactured steel floor scrapers for industrial warehouse floor replacement by Tamult in Austria
Transport and logistics of industrial floor and scraper components manufactured by Tamult for project in Austria
Existing warehouse floor structure before replacement during industrial renovation by Tamult in Austria
Installation of scraper rails and substructure for new industrial warehouse floor by Tamult in Austria

Description

Tamult carried out the replacement of the existing sliding floor system, installing a new HARDOX steel floor and scrapers. All components were manufactured by Tamult and installed on site in Austria.

Customer

-

Fuel

Biofuels

Power

-

Project

Manufacturing and installation of fuel storage scrapers

Installed

2025

Country

Austria

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team