Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Design and construction of Rapla 0,72 MW boiler plant

Completed biomass boiler plant exterior view in Rapla
Biomass boiler room installation and mechanical works in Rapla
Biomass boiler plant installation work in progress at Rapla site
Biomass fuel reception building and loading bay at Rapla boiler plant
Biomass fuel unloading from truck at district heating boiler plant
Wood chip unloading process at Rapla biomass boiler plant
Push/pull floor biomass fuel storage system at Rapla district heating plant
Electrical automation and control panels in biomass boiler plant in Rapla
Biomass boiler room with installed boilers and piping in Rapla district heating plant
District heating substation with insulated pipes, circulation pumps and heat distribution equipmen
Ash container for biomass boiler ash removal at Rapla plant

Description

Tamult designed and built a biofuel boiler plant in Võsa Street, Rapla, as a complete solution to ensure reliable and automated heat production. During the renovation, the existing boiler house was upgraded and a new fuel reception and storage system was installed, allowing efficient and stable operation all year round.

A biofuel-fired boiler with a thermal capacity of at least 0.72 MW, designed to operate over a wide load range and using a variety of biofuels, was installed in the boiler house.

The fuel is received directly from the truck without any additional equipment, with a receiving system capacity of at least 160 m³/h. The fuel shall be transported to the biofuel storage depot by means of auger conveyors. The biofuel storage shall have a capacity of at least 250 m³ and shall be equipped with a hydraulically mobile floor system to ensure a steady and reliable fuel supply to the boiler and to allow the discharge of more than 95% of the stored fuel.

As part of the project, Tamult designed, manufactured and installed the fuel and ash transport systems, the automatic ash handling system and carried out the entire construction of the boiler house, including the installation of the boiler, piping, flue gas ducts, electrical and automation systems and the connection to the existing district heating network.

The result is a modern and efficient biofuel-fired boiler plant that reduces operating costs, simplifies day-to-day management and complies with all applicable standards and safety requirements.

Customer

SW Energia OÜ

Fuel

Woodchips

Power

0.72 MW

Project

Reconstruction of the Rapla biofuel boiler plant

Installed

2025

Country

Eesti

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team