Description

Within the scope of the project, we installed the entire technological equipment of the boiler plant, from fuel reception to ash removal, and insulated all hot surfaces. The installed equipment also includes an electrostatic precipitator from ECP Airtech.

We designed, manufactured, and installed the superheated water piping and the associated equipment from the boiler to the heat exchanger in the boiler room. The pump and heat exchanger unit was assembled on a transport frame in our production facility in Estonia.

For the project, we manufactured a furnace for the combustion of wet biofuels, air and flue gas ducts, a fuel conveyor, a wet ash conveyor, a hydraulic fuel feeder, and a moving-floor fuel storage.

Customer

Saxwerk AB

Fuel

Woodchips

Power

6 MW

Project

Rundvirke (Sweden) 6 MW Superheated Water Boiler Plant

Installed

2024

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.