Over 400 MW equipment produced
The oldest working device is over 25 years old
Product development is done by in-house specialists
Own installation and maintenance team

Construction and Installation of a 0.9 MW Pellet-Fired Boiler Plant

Biomass boiler house with capacity of 0,9 MW
0,9 MW biomass boiler house
0,9 MW biofuel boiler burner
0,9 MW biomass boiler house multicyclone
0,9 MW biomass boiler house
0,9 MW wood pellet bunker
piping of the biofuel boiler house

Description

The client’s task was to replace the existing woodchip boiler with a more powerful pellet boiler – to design and construct a fully automatic wood-pellet-fired boiler plant together with a fuel bunker. A biomass boiler with a thermal capacity of 0.9 MW was designed for the new boiler house. The existing 0.9 MW gas boiler with its current burner remained in use as a backup unit. The primary fuel is wood pellets, and the reserve fuel is natural gas.
The objective of the project was to design an automatic biomass boiler plant capable of operating unmanned, without the need for constant human presence.

For heat supply, a fully automatic pellet boiler with a burner is used, together with a reserve boiler. The boiler plant is equipped with an existing automatic system for activating the reserve boiler. This system consists of a motorised rotary valve installed on the return lines of both boilers, a temperature sensor on the pellet boiler’s supply line, and a two-stage temperature controller.

Under normal operating conditions, the pellet boiler is in use and the rotary valve of the gas boiler is closed. When the pellet boiler’s water temperature drops to the first threshold, the rotary valve of the gas boiler opens and the gas boiler starts. When the pellet boiler’s water temperature drops to the second threshold (likely due to a pellet boiler malfunction), the rotary valve of the pellet boiler closes and only the gas boiler remains in operation.

Once the pellet boiler’s water temperature rises back to the required level, the rotary valve opens again for the pellet boiler, and the gas boiler shuts down.
The boiler plant operates unmanned, and all processes function automatically according to the required power output.

Customer

Fors MW AS

Fuel

Wood pellet

Power

0.9MW

Project

Construction and Installation of a 0.9 MW Pellet-Fired Boiler Plant

Installed

2022

Why are we a good partner?

We can offer our partners and customers top expertise in the field, high-quality delivery, installation, and after-sales service.

The oldest device set up and working by us is already more than 25 years old. We estimate the lifetime of our newer boiler houses to be 20+ years, and the total maintenance cost is 10-20% of the purchase price.

Our factory constantly tests new ways to make products more efficient. Everything that leaves our factory always meets the regulations and requirements.

Our sertificates

Our partners

Contact us

Tamult OÜ Team

Tamult OÜ Team